Hackney - Suspended Steel Framework

A few site photographs showing the installation of the steel framed meeting rooms which float between floors at one of our projects.

We diligently removed the existing ground floor slab to expose the original steel framework of the warehouse.

Following the slab removal the steel framework was installed with the loads carefully shared between the existing and our new framework to create the illusion of floating/suspended boxes within the opening.

It was such an interesting idea for the use of the warehouse and we are looking forward to installing the bespoke staircase soon.

This incredible site is starting to take shape and we cannot wait to see the end result!